Chongqing East Railway Station Guide 2026: Metro and Transfers
Quick answer: Chongqing East Railway Station (重庆东站, Chongqingdong) is a new hub in Nan'an District. Reach it on the Line 6 branch via Liujiaping, and never confuse it with Chongqing North or Chongqing West on a ticket.
The station and the Line 6 East Station section opened together on June 27, 2025. The metro branch is 6.9 kilometers long and includes Chongqing East, Taohuaqiao, Bailiyuan and Liujiaping. At Liujiaping, passengers transfer on the same platform for the main Line 6 route.
Which Chongqing station is on your ticket?
| English name | Chinese name | Ticket label | Planning note |
|---|---|---|---|
| Chongqing East | 重庆东站 | 重庆东 / Chongqingdong | New Nan'an hub, Line 6 branch |
| Chongqing North | 重庆北站 | 重庆北 / Chongqingbei | Large established hub with north and south squares |
| Chongqing West | 重庆西站 | 重庆西 / Chongqingxi | Western hub, different metro and road approach |
| Shapingba | 沙坪坝站 | 沙坪坝 / Shapingba | Central-west location integrated with metro |
Check the Chinese characters in 12306 and in your ride-hailing app. A driver hearing only "Chongqing station" may ask which one, and a wrong cross-city transfer can cost more than an hour.

China high-speed train at a station platform
How do you reach Chongqing East by metro?
Use Line 6 toward Liujiaping, then follow signs for the Chongqing East branch. The official opening notice describes a same-platform transfer at Liujiaping, which removes a long walk but does not mean every Line 6 train continues directly to the railway station.
The branch's initial published operating period was 07:30–21:30. Treat that as background, not a promise for your date. Check current first and last train times in the Chongqing Rail Transit app or station notice, especially for an early departure or late arrival.
Chongqing's steep streets, large complexes and layered road network make map distance misleading. For a train departure, aim to reach the railway station 45–60 minutes before departure after you enter the correct building. Add more time if you need ticket help, have large luggage or are traveling during a holiday.
What is the safest transfer plan?
- Search the exact railway station in Chinese.
- Keep your passport and 12306 order ready before security.
- Follow the train number on the main display, then confirm the waiting hall and gate.
- Do not rely on a screenshot made weeks earlier; timetables changed nationally on July 1, 2026.
- If transferring between Chongqing hubs, allow 90 minutes or more and calculate the route on the day.
Book China train tickets in English
Compare live schedules and passport-ready booking; 12306 remains the official fee-free alternative.
Some links are affiliate links; we may earn a commission at no extra cost to you.
The free official option is China Railway 12306. Third-party services may charge a booking fee, so compare the final total.

Elevated rail lines in Chongqing's layered cityscape
Where should you wait or meet a driver?
Use the signed arrival or departure pickup zone and send the exact gate or level. "Outside Chongqing East" is not precise enough in a large hub. Save 重庆东站 in your phone and share the pin from a Chinese map app.
If you arrive after the last useful metro connection, use the official taxi queue or a recognized ride-hailing app. Ignore people soliciting rides inside the arrivals flow. Confirm the plate before entering.
Common mistakes
- Selecting Chongqing North because it appears first in an English search.
- Assuming every Line 6 train runs through to Chongqing East.
- Ordering a car without sending the pickup level.
- Arriving with no buffer for passport checks and a large concourse.
- Using an old timetable after the July 2026 national schedule change.
Who this is for
- Good fit: passengers whose 12306 ticket explicitly says 重庆东, and travelers connecting through the new Nan'an hub.
- Not for: anyone ticketed from 重庆北, 重庆西 or 沙坪坝. Go to the printed station, not the newest one.
For the wider booking process, read the best way to book China train tickets and the China train network map guide.
Frequently asked questions
Is Chongqing East the same as Chongqing North?
No. They are separate stations in different parts of the municipality. The Chinese labels are 重庆东 and 重庆北.
Does Line 6 go to Chongqing East Railway Station?
Yes, through the East Station branch. Travelers on the main Line 6 route may need the same-platform transfer at Liujiaping.
How early should I arrive?
Aim to enter the correct station 45–60 minutes before departure. Add time during holidays, with children, or if passport verification needs help.
Can I use an English train booking app?
Yes, but compare fees and station labels. 12306 is the official fee-free booking source; third-party apps can offer English support for a charge.
Sources
- Chongqing Metro Line 6 East Station section opening notice · Chongqing Municipal Transport Commission
- China Railway official English booking site · China Railway 12306
- July 2026 national railway timetable adjustment · Xinhua